definition: after the fiber connection light transmitted to will produce certain amount of loss is called joint weld loss or loss.

reasons: optical fiber splicing loss mainly by optical fiber transmission loss and optical fiber welding the weld joint of loss. Because of the influence of fiber connection quality optical fiber line guest limit, the transmission loss of fiber optic equipment line WuZhongJi amplifier parameters such as transmission distance, so as far as possible reduce optical fiber fusion splicing loss, to ensure that the optical fiber CAT transmission quality.

so how to reduce the loss of optical fiber fusion splicing? Method is as follows:

1, as far as possible on a route using the same batch of * bare fiber

2, cable according to the requirements of

3, choose experienced personnel trained fiber connection to continue

4, in place of cable shall be carried out in a neat environment

5, choose high precision fiber optic equipment end face of the cutter to the preparation of optical fiber end face

6, the proper use of welding machine

wiring skills & ndash; — Wiring of the threading technique

wiring project, the level of construction directly affects the performance of the system, serious be rework again, such as playing slot dialed the wrong number, the color scale on the distribution frame standard backwards and the wrong number, including threading technology ( Such as cable through the tube, through the transition box, etc. ) Is a commonly used technique, now the more mature experience summarize, for your reference.

threading technology is a relatively common wiring technology, in order to keep the cable from scraping the broken causing & other; Short circuit & throughout; In all of the steel pipe mouth to put plastic to protect the mouth. A feasible method is thread personnel should carry when construction & other; To protect the mouth & throughout; , can be placed at any time when necessary, in order to avoid because you don't have & other; To protect the mouth & throughout; While & other; Lazy & throughout; 。 Vertical cable through the transition box walking into vertical steel pipe to the next layer, the transition to tie hanging in the box, avoid cable weight total pressure on the corner in the side of the cable, because it affects the transmission characteristics of cable. In the vertical line of cable tie hanging a per meter. Line groove cloth cable should be straight, no winding, and length.

about & other; Yu line throughout the &; Problem, cables in the distribution box & other; Yu line throughout the &; Length to be consistent, and not too long. Over the line according to the grouping table group, from the trough export straight good binding, colligation point spacing is not more than 50 cm. It is important to note that unavailable or hard wire power cord tie.

questions about the label, the cables shall be carried out in accordance with the floor plan of computer label, each label corresponding to a 4 to the conductor, the corresponding room and socket position cannot be mistaken, in the implementation, this is the place where zui error prone. Experience is that both ends of the label position from the end of the 25 cm, light color plastic adhesive tape, use oily pen write the label above sign or affix paper, and then wrap the scotch tape.

in addition, generally speaking, according to the proportion of 3% spare line wear, standby line is placed within the main tank, at least one spare thread on each floor. Threading, after the completion of all the four core cables shall be fully tested on and off. Test can be used the following method, strip away all of my both ends of the cable core, copper core. With the digital multimeter at one end to the on-off test, two pens and received a pair of cable core, at the other end of the cable core is frequent, brief contact. If the table side can hear the sound of the intermittent said tests pass, every 4 to the core of the cable should be measured. Can be found through such test, break, break, and the wrong number.

during the wiring, it is important to note, there is also a cable pulling cable box after not cloth in place, if you want to suspend construction, wire winding up carefully, should be properly kept. This is a lot of wiring construction team did not have standard management often easy to overlook.

address: Shanghai gongkang road no. 1018: : shou-ping xu: - 400015555886 Message: send message personalization: WWW. sute163. com: www。 st5118. Com platform: http://www. chem17。 com/st191617/


Fibra Opticas Tek Technology Co., Ltd. undertakes bulk operations and specializes in undertaking corporate offers to cater the needs of different companies.
Fibra Opticas Tek Technology Co., Ltd. would like to provide our customers with as near perfect protection, as near perfect service as is humanly possible and to do so at the lowest possible cost.'
But we do think that reckoning with supply chains of fiber optic equipment is a really important step. Even super simple switches in material, or sourcing, or shipping, or worker benefits seems like good place to start.
fiber optic equipment is sold in oversees market and has high reputation. Besides, our products are sold with reasonable prices.
Offering a loyalty program not only makes customers feel valued, but it allows Fibra Opticas Tek Technology Co., Ltd. to easily collect important information about customers.
Custom message
Chat Online
Chat Online
Chat Online inputting...